No | Nama Peserta | K | A | T | ST | P | PT | HN | H | P | PK | Alasan |
---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | cv. ANSILA CIPTA Konsultan - 01.918.104.9-617.000 | 77,41 | Rp. 87.832.000,00 |
Rp. 87.832.000,00 |
||||||||
2 | CV. Oebazin Consultant - 02.948.678.4-924.000 | 77,54 | Rp. 91.759.000,00 |
Rp. 84.260.000,00 |
||||||||
3 | CV. SAHWANA - 02.427.790.7-922.000 | |
|
|||||||||
4 | PT. ACIDATAMA PERKASA CORPORINDO - 95.572.273.1-924.000 | Rp. 0,00 di bawah 80% Nilai HPS |
Rp. 78.166.000,00 |
CV. ACITAMA PERKASA dinyatakan gugur administrasi karena hanya menyampaikan Daftar Kuantitas dan Harga. Hal ini bertentangan dengan dokumen pengadaan BAB III. Pasal 27.5 huruf b angka 1) yang berbunyi : syarat-syarat substansial yang diminta berdasarkan Dokumen Pengadaan dipenuhi/dilengkapi; | ||||||||
5 | CV. Watu Rambung - 75.315.858.3-924.000 | |
|
|||||||||
6 | CV. MULTI CIPTA DESIGN - 01.820.714.2-922.000 | |
|
|||||||||
7 | CV. FOURTUNA BERKAT MANDIRI - 73.490.039.2-922.000 | |
|
|||||||||
8 | MULTIKREASI ENGINEERING, CV - 70.460.678.9-922.000 | |
|
|||||||||
9 | CV. DONGKAR DOLA SAKTI - 82.774.599.3-924.000 | |
|
|||||||||
10 | CV. DISEN KONSULTAN - 02.743.647.6-922.000 | |
|
|||||||||
11 | CV. DESAKON - 02.536.888.7-922.000 | |
|
|||||||||
12 | CV RAHILSTAN ENGINEERING - 02.307.835.5-924.000 | |
|
|||||||||
13 | CV. ZEMY - 01.600.747.8-922.000 | |
|
|||||||||
14 | CV. KUKUH ABADI - 01.600.884.9-922.000 | |
|
|||||||||
15 | CITRA NGADA PLAN, PT - 02.077.049.1-923.000 | |
|
|||||||||
16 | CV. ARCHILOGIC - 03.137.786.4-922.000 | |
|
|||||||||
17 | CV. Detail Engineering Disain Consultan - 02.076.952.7-923.000 | |
|
|||||||||
18 | CV. Barometer Entete - 74.484.698.1-922.000 | |
|
|||||||||
19 | CV. ELROS - 81.248.424.4-922.000 | |
|
|||||||||
20 | CV. Sains Group Consultan - 01.600.835.1-922.000 | |
|
|||||||||
21 | CV. ARILES DESIGN - 02.536.874.7-922.000 | |
|
|||||||||
22 | CV. SABA CONSULT - 02.427.631.3-922.000 | |
|
|||||||||
23 | PT Asa Mitra - 02.252.891.3-901.000 | |
|
- A Evaluasi Administrasi
- T Evaluasi Teknis
- ST Skor Teknis
- P Penawaran
- PT Penawaran Terkoreksi
- HN Hasil Negosiasi
- SH Skor Harga
- SA Skor Akhir
- K Evaluasi Kualifikasi
- SK Skor Kualifikasi
- SB Skor Pembuktian
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak